Yes, I have a plan. Cycles Marguerite will be moving from Foster St. at the end of December. After a little construction project and some organization, I will be setting up shop at home. This is a very positive plan and should work out nicely. It means that the shop will be closed for a short time, but I hope to be up and going before spring. Thanks everyone for your continued support.
Tuesday, December 13, 2011
Monday, November 21, 2011
Moving....
I hate to post this, but Cycles Marguerite will be moving soon. I am losing my space at 609 Foster St. overlooking right field of the historic Durham Athletic Park. I will keep everyone updated on the particulars as they become a little more definite. Thanks for keeping up.
Saturday, November 12, 2011
Frame Graphics:
Frame graphics are all done. This sample display was painted by Toby at Hot Tubes.
Take a look.
Down Tube
Down Tube Decals in Blue, Orange, Black, White and Clear.
Upper Seat Tube Band and Made in NC.
Lower Seat Tube Band.
Head Badge.
Display Complete!!
Saturday, November 5, 2011
Fork Revisited:
Spent some time reworking my fork bending fixture this week. See the results below.
New bend on the bottom, old bend on the top. Both of these blades have 45mm of rake. Thanks for the advice Tom, the new curve looks much better!!
Also spent some time helping a friend, Andy (Mantooth Industries) with a little machining on his frame jig.
This is the stand off for the rear triangle.
Saturday, October 29, 2011
Fork
Fork Raking Fixture
Blades pre-rake
Fixture Loaded
Blades Raked
For those of you with any interest:
REG HARRIS
PATRICK SERCU
Saturday, October 22, 2011
1971 or so, HOOKED!!
That is all I can say. These two racers and these two bikes.
I can remember reading about the two racers ( Do you know who they are?) and the bicycles speak for themselves.
Thursday, October 13, 2011
Friday, October 7, 2011
Head Badge Process
Tube cleaned, fluxed with Magpie held in place.
Add a little heat and silver; this is what you get
Flux is then soaked off and if you did things kinda right there is little or no clean up needed along the shoreline
Next, a little filing followed by a little sanding
Then a little elbow grease and a buffing wheel.
Ta Da, finished Head Badge.
This is what the final version looks like, two feet and a clean braze.
Saturday, October 1, 2011
Busy
Finally, Fall is here. For a few days anyway. Things are going well. Shop is pretty much set up and ready to roll. Everything is in place to start cranking out frames. I will try to update a little more regularly.
The Magpie is sufficiently rusted, so I had better get to work.
I have been working on engraving fork crowns. The logo fits nicely on a CX crown.
Here is the set up on the little CNC mill.
This is a little better view.
Finished and Final version of the headbadges. Many thanks to Neal at Vega.
This is a polished version of the prototype. Missing a foot and not super clean, but you get the idea.
Decals are complete. I will post photos soon.
Monday, August 15, 2011
Wednesday, June 1, 2011
Subscribe to:
Posts (Atom)